top of page

ACCOMPLISHMENTS

A330 Tooling Project

  • Assist our customer in providing detailed inspections of tooling procured from international OEMs

  • Complete conformance reports

  • Providing feedback on safety, quality and warranty concerns

  • Assist the customer in providing detailed reports on continual improvement from International standards to local legislative controls

  • Provide a point of contact and reports for a local supported and accredited workshop facility in Aviation Tooling

  • Assist in providing parts and labour to review, repair and load test specific tooling

A380 Tooling Project

  • Assist our customer in providing detailed inspections of tooling procured from international OEMs

  • Complete conformance reports

  • Providing feedback on safety, quality and warranty concerns

  • Assist the customer in providing detailed reports on continual improvement from International standards to local legislative controls

  • Provide a point of contact and reports for a local supported and accredited workshop facility in Aviation Tooling

  • Assist in providing parts and labour to review, repair and load test specific tooling

 

B787 Tooling Project

  • Assist our customer’s in providing detailed inspections of tooling procured from international OEMs

  • Complete conformance reports

  • Providing feedback on safety, quality and warranty concerns

  • Assist the customer in providing detailed reports on continual improvement from International standards to local legislative controls

  • Provide a point of contact and reports for a local supported and accredited workshop facility in Aviation Tooling

  • Assist in providing parts and labour to review, repair and load test specific tooling

  

Recovery of A380 - FWD Door

  • Assist in an AGO of a damaged AC in customer Hanger

  • Provided an assessment of Australian Standards approved controlled lift and setup of a non-standard lift from AC manufacture

  • Liaised with the customer and crisis response team

  • Conducted and assisted in setup, removal, and landing of the Damaged component.

  • Provided lifting slings, safety nets, safety devices in aid of the process.

  • Provided AOG support until AC was no longer at risk.

bottom of page