
ACCOMPLISHMENTS
A330 Tooling Project
- 
Assist our customer in providing detailed inspections of tooling procured from international OEMs 
- 
Complete conformance reports 
- 
Providing feedback on safety, quality and warranty concerns 
- 
Assist the customer in providing detailed reports on continual improvement from International standards to local legislative controls 
- 
Provide a point of contact and reports for a local supported and accredited workshop facility in Aviation Tooling 
- 
Assist in providing parts and labour to review, repair and load test specific tooling 
A380 Tooling Project
- 
Assist our customer in providing detailed inspections of tooling procured from international OEMs 
- 
Complete conformance reports 
- 
Providing feedback on safety, quality and warranty concerns 
- 
Assist the customer in providing detailed reports on continual improvement from International standards to local legislative controls 
- 
Provide a point of contact and reports for a local supported and accredited workshop facility in Aviation Tooling 
- 
Assist in providing parts and labour to review, repair and load test specific tooling 
B787 Tooling Project
- 
Assist our customer’s in providing detailed inspections of tooling procured from international OEMs 
- 
Complete conformance reports 
- 
Providing feedback on safety, quality and warranty concerns 
- 
Assist the customer in providing detailed reports on continual improvement from International standards to local legislative controls 
- 
Provide a point of contact and reports for a local supported and accredited workshop facility in Aviation Tooling 
- 
Assist in providing parts and labour to review, repair and load test specific tooling 
Recovery of A380 - FWD Door
- 
Assist in an AGO of a damaged AC in customer Hanger 
- 
Provided an assessment of Australian Standards approved controlled lift and setup of a non-standard lift from AC manufacture 
- 
Liaised with the customer and crisis response team 
- 
Conducted and assisted in setup, removal, and landing of the Damaged component. 
- 
Provided lifting slings, safety nets, safety devices in aid of the process. 
- 
Provided AOG support until AC was no longer at risk. 




